Several buildings to lose power for 30 minutes at 3:30
Posted: Wednesday, October 16th, 2019, 1:33 pm PDT
In order to restore power to a number of buildings affected by the overnight power outage, several additional buildings on the main Stanford campus will need to lose power for 30 minutes at 3:30 p.m. today. An adjacent line serving these buildings must be powered down in order to power up a line originally affected by the outage.

The following buildings will lose power for approximately 30 minutes at 3:30 p.m. today:

Branner Hall
Encina Hall and Commons
Terman Engineering (parts of Building 02-500)
The Nitery
Toyon Hall
Wilbur Hall
Several construction trailers

Please note that some of these buildings may have emergency backup power during this period.

For other buildings affected by the original overnight outage, the restoration of power, originally scheduled to begin after 12 noon today, will need to wait for this additional step to occur. We hope to see power restoration beginning in the 4:00 hour.

The Bookstore and Barnum Center are still expected to see power restoration later in the day.

We apologize for this inconvenience and appreciate the community’s patience. Updates will continue to be available at https://emergency.stanford.edu.